Case Studies 1: “Reduction Of Maintenance Cost” One of our client basically had high maintenance cost above the approved budget. Based on data, the increase was incremental year to year basis. The Approval budget for year 2007:
Six Sigma was applied to this project. A project charter was first established during the Define Stage. During Measure Stage the Green Belt candidate found out potential factors affecting the project using various kinds of tools as follow :
Based on the Analysis, element selected that was detrimental to the high Maintenance Cost were the following:
Therefore, during the Improvement, the elements above were improved in stages and gained the Control by using a maintenance cost monitoring plan. Case Studies 2: “ Reduction Of Energy Consumption On Electricity And Natural Gas” Our client basically had high cost on Energy Consumption for Electricity And Natural Gas. Based on data, the increase was incremental year to year basis. The usage for year 2007:
During Measure Stage the Green Belt candidate found out potential factors affecting the project using various kinds of tools as follow :
Based on the Analysis, element selected that were detrimental to the high energy consumption were the following:
Case Study 3: “Minimizing Material Loss” One of our client studied data that showed some plants have materials losses higher than current goal (KPI). The calculated financial impacts to company for above losses are RM2.20 per m3 at the plants in total. For Define phase the following were completed:
For the Analyse Phase, the following were completed:
From analysis, the following were found to be detrimental to material loss:
For the Measure phase, the following were completed:
For Improve and Control Stage, the following actions were taken:
Case Study 4: “Increase High Value Quarry Production” One of our client found that the existing plant design produced c/run (low value product) about 58% from total production tonnage since 1993. Management has decided to produce more of 20 mm aggregate, 10 mm chipping and quarry dust (high value products) up to 70% of total production. The existing plant flow is unable to fulfill the management request. For Define phase the following were completed:
For the Measure phase, the following were completed:
For the Analyse Phase, the following were completed:
From analysis, the following were found to be detrimental to material loss:
Therefore, in Improve and Control Phase, the following were implemented:
Case Study 5: “Improving the Linen & Laundry Services for Hospital” One of our client studied data that showed most Linen weight per bed is not fulfill as it targeted as below
For Define phase the following were completed:
For the Measure phase, the following were completed:
For the Analyze Phase, the following were completed:
Therefore, in Improve and Control Phase, the following were implemented:
Contact us for a custom proposal according to your specific needs that will help your business achieve its objectives.
|